BW II – Edifício Industrial em Viana do Castelo | Multiprojectus

Save
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus

Information

  • Project Name: BW II – Edifício Industrial em Viana do Castelo
  • Practice: Multiprojectus
  • Products: Caixilharias
  • Completion year: 2024
  • Gross Built up Area: 27 000 m2
  • Project Location: Viana do Castelo
  • Country: Portugal
  • Lead Architects/Designer: Arqt.º João Pinto de Sousa
  • Engineering: Multiprojectus
  • Contractors: Garcia Garcia, S.A.
  • Collaborators: Arqt.º António Sousa e Arqt.ª Fernanda Araújo
  • Photo Credits: Ivo Tavares Studio
  • Others: Light Design: Multiprojectus, Acoustic Design: Multiprojectus, Fluids Engineering : Multiprojectus, Thermal Engineering: Multiprojectus, Visual identity: Multiprojectus
More Info Less Info

Excerpt: BW II – Edifício Industrial em Viana do Castelo by Multiprojectus aims for a cohesive architectural language, focusing on the main elevation’s “skin” using a single cladding material, prefabricated concrete panel. This material adapts to the project’s needs and situations. The main elevation is designed by repeating vertical “slats” in a prefabricated panel, defining the solution through a matrix.

Project Description

BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio

[Text as submitted by architect] The Industrial Building in Viana do Castelo project consists of a new industrial unit in Lanheses, Viana do Castelo, and is made up of two apparently autonomous volumes with different heights. The first volume – a large industrial/warehousing/technical area with a canopy protecting the shipping area. The second volume – a social and administrative area, comprising 2 floors above the ground level and “drawing” the main elevation of the building.

BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
Axonometric © Multiprojectus
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio

The proposal focuses on the main social and administrative block, opting for an architectural language that gives unity and continuity to the whole. The research focused on the “skin” of the main elevation, based on the search for a single cladding material (prefabricated concrete panel), which adapts to and standardizes all the project’s situations and needs.

BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
Sections © Multiprojectus
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio

The main elevation is designed by repeating vertical “slats” in a prefabricated concrete panel, based on a matrix that defines the solution. The “rule” imposes itself and makes up the main language of the complex. Due to the large development of the main elevation, there are several outdoor patios that strategically “excavate” and deconstruct the volume. This “game” of “full/empty” creates greater flexibility and variety in the play of light inside the building. 

BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio
BW II – Edifício Industrial em Viana do Castelo | Multiprojectus
© Ivo Tavares Studio

The main entrance to the building is made up of the design of the foyer with double-height ceilings and a “suspended” staircase, which is the main element of this space. The staircase is detached from the walls and slab and is joined by a loose concrete volume that rises from the floor and forms the first three steps of the staircase. The two volumes do not touch, creating a moment of tension between them.