Technical Services Base Lysolaje | Progres Architekti

Save
Technical Services Base Lysolaje | Progres Architekti

Information

  • Project Name: Technical Services Base Lysolaje
  • Practice: Progres Architekti
  • Products: Lindab , Sklomont , Hoermann
  • Completion year: 2022
  • Gross Built up Area: 437 m²
  • Project Location: Prague
  • Country: Czech Republic
  • Lead Architects/Designer: Jan Kalivoda, Vojtěch Kaas
  • Design Team: Michal Svoboda, Tereza Soubustová
  • Clients: District Prague – Lysolaje
  • Contractors: PSP - GDS
  • Photo Credits: Alex Shoots Buildings
  • Others: Statics: Losík statika
More Info Less Info

Excerpt: Technical Services Base Lysolaje, an architecture project by Progres Architekti, prioritizes functionality, truthfulness, variability, sustainability, and respect for surroundings. The design incorporates low volume into the hillside, featuring rhythmic facades and exposed structures and materials without additional layers. The public building aims to set trends in sustainability, renewable energies, interior standards, and materials used.

Project Description

[Text as submitted by architect] During the preparation of the project, the architects found that, unlike abroad, most technical buildings in the Czech Republic are built without architectural care. Often there are distinctive and expensive buildings without a concept and context, where the potential to reveal their unique poetics has been lost.

Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings

Together with the representatives of the Prague city district Lysolaje, the architects, therefore, set the basic thesis of the design at the beginning. Functionality, truthfulness, variability, sustainability, respect for the surroundings, quality of the indoor environment, and educativeness became the main themes, which they further kneaded to obtain a balanced result.

Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings
Technical Services Base Lysolaje | Progres Architekti
Ground Floor Plan © Progres Architekti
Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings
Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings

The architects help the natural settling into the surroundings by embedding the low volume into the hillside. They establish a relationship with the surrounding residential buildings by rhythming the facades and using timber on the main frontage. Its tranquil surface comes alive during operation, where the pulse of the opening and closing of the various modules gives the building a unique dynamic.

The spatial modular web of the prefabricated concrete frame fulfills the maximum level of variability and allows to comfortably place two operations with different requirements. At the same time, it flexibly responds to future changes in demands. The larger technical area contains garages for maintenance vehicles, material storage, and an indoor depot. 

Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings
Technical Services Base Lysolaje | Progres Architekti
Section © Progres Architekti
Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings

The smaller area for the crew has significantly different requirements in terms of room size, lighting, acoustics, internal temperature, and appearance. Therefore, it was designed as an independent inset box of lightweight prefabricated steel construction. It houses changing rooms with facilities, a workshop, an office, warm storage, and a lounge, which is also used during night shifts of snow emergencies.

The architects have also used the lightweight construction to provide a separate volume for the manager’s flat on the second floor, which provides a reserve for the future and can be extended over the adjacent modules.

Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings
Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings

The spatial nothing – the entrance atrium – plays a crucial role in the way the house works. It serves as a link to the street, the main entrance, and a communication node, whose level of openness can be adjusted by large pivoting gills. Its skin of glass illuminates the interior with soft diffused light. It is a semi-private meeting point where rain falls, grass grows and tomatoes are planted.

Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings
Technical Services Base Lysolaje | Progres Architekti
Exploded Axonometric © Progres Architekti
Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings

The use of exposed structures and materials without additional covering layers underlines the overall authentic expression. The architects always think about sustainability and the responsibility of entering the environment we live in. They set the energy and environmental concept at a time when this topic was not yet so socially relevant. Thanks to this, the building has been able to withstand the current energy crisis.

The building is meant to become an inspiration for the public. The public building should set the trend in the areas of sustainability, working with renewable energies, the standard of the interior environment, and the materials used.

Technical Services Base Lysolaje | Progres Architekti
© Alex Shoots Buildings

By being embedded in the ground, the unheated technical part maintains a stable temperature and does not freeze. The heated part is insulated in passive standard, the heating system is based on a heat pump. A photovoltaic power plant with battery storage is installed on the roof of the building to run the house and supply maintenance equipment. Rainwater is stored and reused for maintenance and watering. Green roofs improve the microclimate, retain water and soften the building. All interior spaces are illuminated by natural daylight and all living areas have a high standard of interior acoustics. Variability in operational layout and the use of durable materials extend the life cycle of the structure.

Leave a Reply